Back to Top

Paper Title

Green manufacturing: Order acceptance and scheduling subject to the budgets of energy consumption and machine launch

Article Type

Research Article

Research Impact Tools

Issue

Volume : 248 | Page No : 119300

Published On

March, 2020

Downloads

Abstract

This paper investigates an order acceptance and scheduling problem with an energy consumption budget, a machine launch budget, and the order release time in a green manufacturing system. The phenomenon of deteriorating jobs is considered in the production of the accepted orders. The objective of the study is to maximize the net revenue and a modified variable neighborhood search (MVNS) Algorithm that combines a novel encoding and decoding procedure as well as a dynamic programming algorithm is developed to solve it. To show the effectiveness and efficiency of the proposed algorithm, we first employ the MVNS algorithm and seven VNS-based algorithms to solve the problems with different configurations of orders and machines. The results show that the MVNS algorithm obtains better solutions than existing VNS-based algorithms. Then, the proposed algorithm is compared with three meta-heuristic algorithms. The experimental results show that the proposed algorithm has significant advantages in terms of solution optimality.

View more >>